Request for Qualifications: Mechanical, Electrical and Plumbing Engineering

Full Documenthttps://5il.co/236zz

INSTRUCTIONS: This Request for Qualifications (RFQ) is designed to comply with all applicable rules and regulations – including all Board of Education Policies. Firms wishing to submit for consideration should follow the guidelines established herein. A Statement of Qualifications (Exhibit 1) along with supporting documentation, should be submitted to Jimmy Russell, Facilities Project Manager, Alamance-Burlington School System, 1712 Vaughn Road, Burlington, NC 27217, before 12:00 (noon) on September 13, 2023. Statements of Qualification received after that time will not be considered.

PROJECT OVERVIEW
The Alamance-Burlington School System will be requesting evaluation of existing HVAC systems along with recommendations for upgrades and design. Interested firms should be capable of performing the design of all MEP needed for a total and complete design.

EXECUTIVE SUMMARY
Executive Summary limited to three (3) pages including the name of the Proposer, location of Proposer’s principal place of business, a brief narrative description including the age of the business, type of business organization and services offered. Summary should describe the Proposer’s approach to providing Evaluation, Design, and Testing. Identify the Proposer’s strengths and any special qualifications your firm may possess. Please also include your firms approach to project safety during preconstruction and construction.

SELECTION CRITERIA
The criteria in the Statement of Qualifications form (Exhibit 1) will be used by the selection committee to evaluate your submission. Please note, it is very important that you follow the exact order when responding to each item on the form, not doing so creates difficulty for the selection committee to evaluate your submission. Also, answer all questions and fill in all blanks where applicable. The information may be provided on a separate document but the format and order must be followed. Provide Three (3) copies of your submittal and one electronic copy on a USB drive.

QUESTIONS and RESPONSES
All questions and concerns should be sent via email to jimmy_russell@abss.k12.nc.us (please be aware of the underscore between names in the email address) R e s p o n s e s and/or questions should be sent to this email with “MEP Engineering RFQ” as the subject line. All responses will be sent to all vendors that are included in the email list. If you choose to be part of the email response list, please email the above email address with “MEP Engineering RFQ” on the subject line. If you received this RFQ by email you are a part of the email list that will be used.

DUE DATE FOR SUBMITTING PROPOSALS
Three (3) hard copies and an electronic copy on a USB drive must be received by 12:00 (noon), on September 13, 2023, to be considered. Submittals should be submitted to:

Jimmy Russell
Facilities Project Manager
Alamance-Burlington School System
1712 Vaughn Road
Burlington, NC 27217